Sunday, September 13, 2009

Scheme 3 Progress


Progress screenshot of Scheme 3 for the Final Draft submission. Still making significant changes. The ground level "tree" area needs some more "trunks" on the ground level.

The embossed pattern on the right most wall is a leaf-less tree outline. Plants will creep down from the top of this wall (plants will also be at the base of the wall).

More images as the scheme progresses.

No comments:

Post a Comment